Other Name: Cover, Engine Front Cover; Timing Cover; Cover, Engine Cover Front
Position: Front
Replaces: 12601932, 12586647
Warranty: This genuine part is guaranteed by GM's
factory warranty.
Fits the following Vehicles:
2004-2012 Chevrolet Colorado | Base, LS, LT, Sport, Sport LS, WT, Z71, Z71 LS, Z85, Z85 LS | 4 Cyl 2.8 L GAS, 4 Cyl 2.9 L GAS, 5 Cyl 3.5 L GAS, 5 Cyl 3.7 L GAS
Other Name: Cover Assembly-Engine Front; Front Cover
Position: Front
Warranty: This genuine part is guaranteed by GM's
factory warranty.
Fits the following Vehicles:
2009 Chevrolet Colorado | LT | 8 Cyl 5.3 L GAS
Chevrolet Colorado Timing Cover
Our website offers an extensive catalog of genuine Chevrolet Colorado Timing Cover at unbeatable prices. Every OEM Chevrolet Colorado Timing Cover comes with a manufacturer's warranty, an easy return policy, and rapid delivery service. Don't miss out on this great opportunity!
Chevrolet Colorado Timing Cover Parts Questions & Experts Answers
Q: How to Perform a Timing Cover Replacement on Chevrolet Colorado?
A: The procedure for replacing the engine front cover begins by taking out the Water Pump and crankshaft balancer along with drive belt tensioner and Power Steering Pump and Oil Pump pipe and screen assembly. Yield the vehicle before uninstalling first the 7 mm center bolt followed by the other bolts holding the engine front cover in place. Install two bolts with threaded holes to function as jack screws that press evenly against the engine front cover to release it from the engine block. After completing this step remove the engine front cover together with the jack screws. Before reinstalling the pump clean or inspect the surface area of the engine block if needed. Reinstall the Oil Pump after its removal. Slide in j 44219 (Cover Alignment Pins) to ensure proper engine block alignment. Apply a 3 mm (0.12 in) bead of sealer to the engine front cover before aligning the Oil Pump to the crankshaft sprocket splines while placing the front cover over the j 44219 to ensure alignment with the engine block. Start by installing the engine front cover bolts then remove the j 44219 alignment pins before finishing with the remaining 2 bolts which require 10 nm (89 lb in) torque and the small center bolt requires 8 nm (71 lb in). Start by reinstalling the Oil Pump pipe together with the screen assembly before installing the Power Steering Pump followed by drive belt tensioner and crankshaft balancer and finishing with the Water Pump.